Description: PRODUCT DETAIL Back Hook Design Anti-Collision Hard Shell Extra-Large and Colored Dial High Temperature and Corrosion Resistant Rubber Hose (1.5M/5FT) Refrigerant Observation Window Upgraded Aluminum Alloy Knob Connecting with the System & Vacuum Pumping System Before connecting to the system, please check whether the pressure gauge pointer is in the zero position, otherwise open the table adjusting the screw to the zero position. Connecting with the System First close the low pressure valve, high pressure valve; After interface connecting with blue tube(Iow voltage fast connector), and then locking to system low pressure; After interface connecting with the red tube(low voltage fast connector), and then locking to the system high pressure. interface connecting with yellow tube and vacuum pump. Vacuum Pumping System (Note: this step must be carried out under the system pressure, otherwise it should be advanced relief pressure). Upon completing the above, then open the vacuum pump; Open low pressure valve(blue),high pressure valve(red),and (open the high and) low pressure fast interface)the system begins to draw a vacuum; After a certain period of time(10-30min), check whether the system is completely vacuum, otherwise the vacuum should be repaired and re evacuation; Close the high and low pressure valves at the same time, and close the vacuum pump eventually. System Filling Refrigerant Put away the yellow tube and vacuum pump, and then the refrigerant bottle was tightened. Open the refrigerator bottle(forward), and valve core on the table group, exhaust yellow pipe in the air; Invert the refrigerant bottle, open low pressure valve, high pressure valve to add refrigerant; To the specified amount(according to the system provided by the manufacturer of the volume), close the high pressure valve, low pressure valve, while positive refrigerant bottle; After run the system test(about 5-10min), check the system pressure and temperature; If the refrigerant is insufficient, positive the refrigerant bottle, and open the low pressure valve slowly(it is prohibited to open high pressure valve), putting the proper amount of refrigerant gas; If it is too high, you should turn off the cylinder, open the high pressure valve slowly, discharge the amount of refrigerant(at this point should pay attention to the discharge of refrigerant wounding)from table group core, and close the high pressure valve, and retest.back and forth until normal; After running normally, close the refrigerant bottle and valve and then put high and low voltage fast connection and system(pay attention to high temperature hot)away. PACKING LIST Use and Maintenance Detect the high pressure valve, low pressure valve, prohibit misuse to prevent damage to the pressure gauge; Do not use the working quality which is not consistent with the table group; Cannot be forced too much closing the high and low pressure valve; After use release the valve, proper storage, anti shock and fall; Please read the instruction in detail or operate under the guidance of professionals. On May 4, 2023 at 23:41:27 PDT, seller added the following information:
Price: 109 USD
Location: Bordentown, New Jersey
End Time: 2023-12-05T07:36:21.000Z
Shipping Cost: 0 USD
Product Images
Item Specifics
Restocking Fee: No
Return shipping will be paid by: Buyer
All returns accepted: Returns Accepted
Item must be returned within: 30 Days
Refund will be given as: Money Back
Brand: Autory
Country/Region of Manufacture: China
Features: Digital
Gauge Purpose: Pressure
Type: Refrigeration Digital Gauge Meter
Vacuum Units: PSI
Color: Black
Items Included: Gauge
Item Weight: 2
Number of Valves: 3
Year Manufactured: 2022
MPN: Does not apply
Manufacturer Warranty: 2 Years
Item Width: 6.6cm