Cardinal

Fender Telecaster American Standard Neck Pickup Gold Cover Long Leads

Description: Fender Telecaster American Standard Neck Pickup Gold Cover Long Leads Description For sale is a used Fender American Standard telcaster neck pickup from the early 2000's with a gold cover. It is in average condition with some marks & signs of use & wear. There is a small dent on the top of the cover, & discoloration where the retaining tabs were bent over the pickup edges. The black & white leads are both 12" long. No other hardware included. It has been tested. Sold "AS IS", requires parts/installation. No returns. Buyers subject to sales tax. FREE SHIPPING. Payment due immediately using the buy it now option. No intnl. shipping. Ships via USPS to USA only. No local pickup. I only respond to questions I can answer, & those not already answered in the description. Click images to enlarge Images sell! Get Supersized Images & Free Image HostingCreate your brand with Auctiva's Customizable Templates. Attention Sellers - Get Templates Image Hosting, Scheduling at Auctiva.com. Track Page Views WithAuctiva's Counter

Price: 49 USD

Location: Rancho Cucamonga, California

End Time: 2024-10-20T04:12:16.000Z

Shipping Cost: 0 USD

Product Images

Fender Telecaster American Standard Neck Pickup Gold Cover Long LeadsFender Telecaster American Standard Neck Pickup Gold Cover Long LeadsFender Telecaster American Standard Neck Pickup Gold Cover Long LeadsFender Telecaster American Standard Neck Pickup Gold Cover Long LeadsFender Telecaster American Standard Neck Pickup Gold Cover Long LeadsFender Telecaster American Standard Neck Pickup Gold Cover Long Leads

Item Specifics

All returns accepted: ReturnsNotAccepted

Brand: Fender

Type: Single Coil Pickup

Active/Passive: Passive

Color: Gold

Country/Region of Manufacture: United States

MPN: Does not apply

Position: Neck

To Fit: Electric Guitar

Unit Quantity: 1

Recommended

Universal Metal Fender Flares Style 2: 2" Wide, 4-piece set (hand-made)
Universal Metal Fender Flares Style 2: 2" Wide, 4-piece set (hand-made)

$75.00

View Details
Fender Panel Primed Front Driver Left Side For 2009-2013 TOYOTA COROLLA
Fender Panel Primed Front Driver Left Side For 2009-2013 TOYOTA COROLLA

$62.26

View Details
Front RH Fender Mldg/flare Fits 2011-2020 Dodge Durango CH1291112
Front RH Fender Mldg/flare Fits 2011-2020 Dodge Durango CH1291112

$35.42

View Details
Fender For 2008-2017 Dodge Challenger Front Passenger Side Primed Steel CAPA
Fender For 2008-2017 Dodge Challenger Front Passenger Side Primed Steel CAPA

$149.85

View Details
Fender For 2016-2024 Chevrolet Malibu Steel Front Passenger Side GM1241392
Fender For 2016-2024 Chevrolet Malibu Steel Front Passenger Side GM1241392

$128.72

View Details
Fender Set For 1992-95 Honda Civic Coupe Hatchback With Molding Holes Front 2Pc
Fender Set For 1992-95 Honda Civic Coupe Hatchback With Molding Holes Front 2Pc

$117.22

View Details
Fender For 2007-2011 Toyota Camry Front Driver Primed Steel 5380206120
Fender For 2007-2011 Toyota Camry Front Driver Primed Steel 5380206120

$69.88

View Details
Universal Metal Fender Flares Style 1: 2" Wide, 4-piece set (hand-made)
Universal Metal Fender Flares Style 1: 2" Wide, 4-piece set (hand-made)

$100.00

View Details
Fender For 90-97 Mazda Miata Set of 2 Front Driver & Passenger Side Primed Steel
Fender For 90-97 Mazda Miata Set of 2 Front Driver & Passenger Side Primed Steel

$262.57

View Details
Fender For 2017-2021 Honda Civic Front Driver Side Primed Steel
Fender For 2017-2021 Honda Civic Front Driver Side Primed Steel

$75.29

View Details